Loyalty has privileges at Prep4cram β after your CT-PT purchase you get priority access to holiday discounts and sale coupons, so returning for another ISTQB Certified Tester - Performance Testing product costs noticeably less.
ISTQB CT-PT Exam Overview:
| Certification Vendor: | ISTQB |
|---|---|
| Exam Name: | ISTQB Certified Tester - Performance Testing |
| Exam Number: | CT-PT |
| Exam Price: | $199 USD |
| Passing Score: | 65% |
| Exam Format: | Multiple Choice |
| Available Languages: | German, Spanish, English, French |
| Real Exam Qty: | 40 |
| Related Certifications: | ISTQB Certified Tester Foundation Level (CTFL) |
| Exam Duration: | 90 minutes |
| Certificate Validity Period: | Lifetime |
| Sample Questions: | ![]() |
| Exam Way: | Online proctored or in-person exam |
| Pre Condition: | ISTQB Certified Tester Foundation Level (CTFL) certification is required before taking the exam. |
| Official Syllabus URL: | https://istqb.org/certifications/certified-tester-performance-testing-ct-pt/ |
ISTQB CT-PT Exam Syllabus Topics:
| Section | Objectives |
|---|---|
| Tools | - Performance Testing Tools
|
| Performance Testing Tasks | - Test Planning
|
| Performance Testing in the Software Lifecycle | - Performance Risks
|
| Basic Concepts | - Performance Testing Objectives
|
| Performance Measurement Fundamentals | - Metrics and Monitoring
|
CT-PT Exam Details, Version Policy and Customer Perks
- Performance Testing in the Software Lifecycle ()
- Basic Concepts ()
- Performance Testing Tasks ()
ISTQB Certified Tester - Performance Testing Sample Questions:
Which type of performance test measures the system's ability to handle increasing levels of load?
- A. Endurance testing
- B. Elevation testing
- C. Spike testing
- D. Load testing
Correct Answer: D π³οΈ
Explanation: Only visible for Prep4cram members. You can sign-up / login (it's free).
What challenge must be considered when using crowds to emulate load generation?
- A. This type of load generation is more suitable for mainframe applications.
- B. The load generation method is less sensitive to changes in the system under test.
- C. This technique is more precise than other methods of load generation.
- D. The load generation will be difficult to reproduce.
Correct Answer: D π³οΈ
Explanation: Only visible for Prep4cram members. You can sign-up / login (it's free).
Which of the following is a typical performance risk associated with mobile, browser-based, and embedded real-time architectures?
- A. Slow hard disk speed
- B. Internet connectivity issues
- C. Unexpected loads due to API accessibility
- D. Misconfigured host machine
Correct Answer: C π³οΈ
Explanation: Only visible for Prep4cram members. You can sign-up / login (it's free).
Which of the following is a major contributor to unreliable performance projections?
- A. Redundancy between the test and production environments
- B. Business stakeholders setting unrealistic performance goals
- C. Disagreement between the technical and business stakeholders during analysis
- D. Differences in the hardware between the test and production environments
Correct Answer: D π³οΈ
Explanation: Only visible for Prep4cram members. You can sign-up / login (it's free).
What is typically the result of oversaturation of system resources during performance testing?
- A. Response time will gradually improve over a period of time.
- B. Response time will be slow under significant load levels.
- C. The size of the database will gradually decrease.
- D. Error logging will decrease.
Correct Answer: B π³οΈ
Explanation: Only visible for Prep4cram members. You can sign-up / login (it's free).






